Runbooks fail in predictable ways: too long, out of date, or written by someone who never ran the show. Here is what goes wrong and how a crew can fix it.

Daniel Whitcombe 6 minutes to read

Writing for the author instead of the crew

The most frequent fault is a runbook that makes perfect sense to the person who wrote it and nobody else. The author knows which fader is meant by the main desk, which camera is the wide, and why the second cue is held. A freelancer arriving on the morning of the show knows none of that, and a page full of private shorthand costs them time at the worst moment.

I see this often when lighting and staging notes are written last, in a hurry, after the show has already gone well once. The wording drifts into habit: dim the back, bring up the usual look. Usual to whom? A reader who was not in the room cannot act on it.

The fix is simple but needs discipline. Hand a draft to someone who did not take part in the show and ask them to talk you through it aloud. Every place they hesitate is a place the page needs another sentence.

  • Name equipment by its label on the rack or desk, not by nickname
  • Define every abbreviation once, at first use
  • Ask a newcomer to read the draft before it is issued

Documents that grow until nobody opens them

A second mistake is treating the runbook as a place to store everything ever learned. Each fault that occurs gets a paragraph, each guest a footnote, and within a season the document runs to forty pages. In the gallery, with a live feed running, no one will search forty pages for the next step.

A working runbook has layers. The top layer is a single sheet: running order, key contacts, and the handful of checks that decide whether the show can go to air. Beneath it sit the detailed procedures, each short enough to read in a minute and each findable by a clear title.

Length is not the measure of care. A crew that can find the right instruction in ten seconds is better served than one holding a thorough manual they have quietly stopped consulting.

  • Keep one front sheet that fits on a single page
  • Give each procedure its own short heading
  • Move rarely used detail to the back, not the front

Letting the paperwork drift away from the room

Studios change. A light gets moved to clear a new set piece, a mixer is replaced, a monitor is relocated, and the runbook goes on describing the old arrangement. The danger is not that it is wrong in one place but that the crew learns it cannot be trusted and starts relying on memory instead.

Out-of-date lighting notes are a good example. A cue sheet that refers to a fixture which no longer hangs above the set will confuse the operator and may lead to a rushed fix during rehearsal.

Give the document an owner and a rhythm. After each show, whoever ran the gallery spends ten minutes marking what differed from the page. Once a month, the owner folds those marks into a clean revision and replaces the printed copies so that old versions do not circulate.

  • Name one person responsible for each runbook
  • Mark differences straight after every show
  • Date each revision and remove superseded copies

Skipping the failure steps

Most runbooks describe a show that goes to plan. They list the start-up, the running order and the shutdown, then stop. Yet the reason a crew reaches for the document at all is usually that something has stopped behaving, and that is exactly where the page falls silent.

Add a short section for the faults that have actually happened in your own studio: a lost return feed, a talkback line that drops, a cue that fires late. For each, write what the operator sees, the first thing to check, and who to tell. Keep it to a few lines.

Be honest about limits as well. If the answer to a fault is to hand over to an engineer, say so plainly, with a name and a number. A runbook that pretends every problem can be solved at the desk encourages improvisation that makes the situation worse.

  • Record faults that have really occurred, not imagined ones
  • State what the operator sees, then the first check
  • Say clearly when to hand over and to whom

Never testing the document with a real run

A runbook that has only ever been read at a desk has not been tested. Steps that look sensible on paper can turn out to be impossible in sequence: a camera move that needs a hand already occupied, a cue that lands before the operator has the right page open.

The remedy is a dry run in which someone follows the document literally, doing only what it says. Do this in rehearsal, with the real crew in their real positions, and note every point where they had to guess. Those guesses are the gaps.

Run it again after you correct them. It is tempting to treat the first round of fixes as final, but a second pass usually catches the awkward order of steps that the first correction introduced. Two honest passes are worth more than a polished document that nobody has ever followed.

  • Follow the page literally during a rehearsal
  • Note every point where the crew had to guess
  • Repeat the run after corrections are made

Forgetting who the document is for next season

Crews change. People move on, new juniors arrive, and a freelancer covers a holiday. A runbook that depended on the founding team's memory leaves the next group to rediscover the same lessons by trial and error, often on air.

Write with that future reader in mind. Record why a decision was made as well as what it is: why the stage left light stays low during the interview, why the talkback check comes before the audio check. A reason survives changes in equipment where a bare instruction does not.

Keep the finished runbooks together in one place that the whole crew knows, and agree how new starters will be shown it in their first week. Documentation only repeats reliable shows if it is found, read and used by people who were never there when it was written.

  • Record the reason behind each decision
  • Keep every runbook in a single known place
  • Introduce new starters to the documents in week one

Most runbook failures come down to the same few habits: writing for yourself, letting the page swell, neglecting revisions, ignoring faults and never testing the result. None needs special tools, only a little regular attention from the crew. Pick one show this autumn, read its document as a stranger would, and correct what trips you up. A short, current runbook that people actually open is worth far more than a thorough one left on a shelf.

Get in touch

A Lincoln consultancy and resource for studio and broadcast production: cameras, lighting, audio sync, control rooms and workflows, written for working crews.

buzzura
© 2026 buzzura. All rights reserved